Page view 64
POWERCOMMAND NETWORKS
N
ETWORK CABLING AND CONNECTIONS FOR FTT-10 NETWORKS
Table 2 Double-Terminated Bus Topology
Maximum Bus length (Ft)
Belden 8471 8800
Belden 85102 8800
NEMA Level IV 4500
TIA Category 5 2900
A double-terminated bus may have stubs of up to 10 feet from the bus to each device.
Cable Termination
FTT-10 network segments require termination for proper data transmission performance. Free
topology and Double-terminated Bus topology networks differ in their termination requirements.
Free topology segments only require one terminator per segment. This terminator can be placed
anywhere in the segment, but is recommended to be placed near the middle of the segment. All
PowerCommand network interface modules (i.e. GCM, NCM, GLC), Control Communications
Modules (CCM), Digital I/O Modules (DIM) and Lonworks Annunciators have an on-board free
topology terminator. It is recommended that this be used on a free topology segment. Optionally an
external free topology terminator (Onan P/N 0300-5669) can be used.
Double-terminated Bus segments must be terminated at both ends of the segment. An FTT-10 Bus
terminator (Onan P/N 0300-5729) must be used.
This information was accurate on the date published but Page 2 July 25, 2003
could change without notice.
*
*
* Optimal Cable